During the decommissioning process, the federal Nuclear Regulatory Commission (NRC) conducts routine inspections at Indian Point. Links to these reports will be provided below as they are made publicly available by NRC.
- June 2021 Inspection (Issued August 4, 2021)
- September 2021 Inspection (Issued November 9, 2021)
- *November 2021 Security Inspection (Issued November 18, 2021)
- December 2021 Inspection (Issued March 4, 2022)
- March 2022 Inspection (Issued May 25, 2022)
- *May 2022 Security Inspection (Issued May 25, 2022)
- *October 2022 Security Inspection (Issued October 18, 2022) | *Amendment (Issued October 28, 2022)
- September 2022 Inspection (Issued Nov. 17, 2022)
- December 2022 Inspection (Issued March 13, 2023)
- March 2023 Inspection (Issued May 22, 2023)
- June 2023 Inspection (Issued August 22, 2023)
- **December 2022 Fabrication Inspection (Issued September 12, 2023)
*Details of security inspections are not made publicly available due to the nature of sensitive materials.
**Routine Fabrication Inspection conducted at Holtec Advanced Manufacturing Division in Camden, NJ.